Cost-Efficient
Design and Construction from Day One
Design-to-Construction Workflow
Through BIM Modelling
Concept Design Development
Concept & Design Development (BIM-Based)
- Architectural concept design
- 3D BIM model (LOD 200–300)
- Design options & revisions
- Early-stage quantity take-offs (optional)
👉 Ideal for feasibility studies and early investor decisionsseen costs.
Detailed Design & BIM Coordination
Detailed Design & BIM Coordination
- Architectural detailed design
- Coordinated BIM model (LOD 300–400)
- Discipline coordination support
- Clash detection & design validation
👉 For buildable, coordinated projects ready for construction
Quantity Take-Offs & Cost Control
BIM-Based Quantity Take-Offs & Cost Control
- Model-based quantities
- Verifiable and measurable BOQs
- Design-linked cost accuracy
- Reduced waste and cost risks
👉 For contractors, developers, and cost-sensitive projects
Proudly powered by WordPress