Skip to content

Cost-Efficient
Design-to-Construction Workflow
Through BIM Modelling

Design and Construction from Day One

Concept Design Development

Concept & Design Development (BIM-Based)

  • Architectural concept design
  • 3D BIM model (LOD 200–300)
  • Design options & revisions
  • Early-stage quantity take-offs (optional)

👉 Ideal for feasibility studies and early investor decisionsseen costs.

Detailed Design & BIM Coordination

Detailed Design & BIM Coordination

  • Architectural detailed design
  • Coordinated BIM model (LOD 300–400)
  • Discipline coordination support
  • Clash detection & design validation

👉 For buildable, coordinated projects ready for construction

Quantity Take-Offs & Cost Control

BIM-Based Quantity Take-Offs & Cost Control

  • Model-based quantities
  • Verifiable and measurable BOQs
  • Design-linked cost accuracy
  • Reduced waste and cost risks

👉 For contractors, developers, and cost-sensitive projects